green trees line both banks of the sacramento river. the yellow tower bridge crosses the blue water leading to the tall buildings of the sacrament skyline. the scene is set against a clear blue sky.

Resources

Resources, research, data & other tools
50 results found for

New Vehicle and Engine Certification: Executive Orders for MY2025 Spark-Ignited Marine Watercraft

The New Vehicle and Engine Certification Program is responsible for the certification of new engines, vehicles, powertrains, aerodynamic devices and other new certifications.  Vehicles and engines may be sold and otherwise produced in California only if approved by Executive Order (EO) after review by CARB.  Executive Orders are issued for on-road and off-road categories.

Scanned copies of issued Executive Orders may be requested via email.

The following Executive Orders granted to the listed manufacturers of spark-ignited marine evaporative families have been issued during the 2025 model year, as of June 24, 2024.

Further information is available in the Executive Orders Summary.

For questions, please contact Off-Road Spark-Ignited Engine Certification or Help Line at 1-800-242-4450.

BRP MARINE US INC. (ALU)

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑120‑00015/22/202445427OutboardTrailerable (<= 26 ft)

BRP MARINE US INC. (TTI)

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑121‑00026/21/2024STTIPVSSL222OutboardNontrailerable (> 26 ft)

BRUNSWICK COMMERCIAL & GOVERNMENT PRODUCTS, INC.

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length

U‑W‑109‑0007

5/24/2024SBR1PVSSLNT1OutboardNontrailerable (> 26 ft)
U‑W‑109‑00085/24/2024SBR1PVSSLNT2OutboardNontrailerable (> 26 ft)

KAWASAKI MOTORS, LTD.

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑007‑00792/20/2024SKAXPVSSLAAAPersonal WatercraftTrailerable (<= 26 ft)

KINGFISHER BOATS

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length

U‑W‑053‑0022

5/22/2024SWWNPVSSL001OutboardNontrailerable (> 26 ft)

U‑W‑053‑0023

5/22/2024SWWNPVSSL002OutboardTrailerable (<= 26 ft)

LOWE BOATS

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑046‑00256/17/2024SLWBPVSSLTB1OutboardTrailerable (<= 26 ft)

MAVERICK BOAT GROUP INC.

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑057‑00085/1/2024SMBGPVSSL002OutboardNontrailerable (> 26 ft)

REC BOAT HOLDINGS, LLC

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑055‑00385/24/2024SRECPVSSLACNOutboardNontrailerable (> 26 ft)

ROBALO BOATS, LLC

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑063‑00266/17/2024SRBLPVSSLONPOutboardNontrailerable (> 26 ft)
U‑W‑063‑00276/17/2024SRBLPVSSLOTPOutboardTrailerable (<= 26 ft)

SANGER BOATS,INC.

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑050‑00155/21/2024SSBIPVSSLALUInboardTrailerable (<= 26 ft)
U‑W‑050‑00165/21/2024SSBIPVSSLPLAOutboardNontrailerable (> 26 ft)

SEA RAY BOATS

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑037‑00335/22/2024SSRBPVSSLNT4Sterndrive, OutboardNontrailerable (> 26 ft)

WALKER BAY BOATS LLC

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑103‑00035/21/2024SWBBPVSSL001OutboardTrailerable (<= 26 ft)

YAMAHA MOTOR CO., LTD.

EO #DateEvaporative FamilyWatercraft TypeWatercraft Length
U‑W‑003‑05472/20/2024SYMXPVSSLYJ7JetboatTrailerable (<= 26 ft)
U‑W‑003‑05482/20/2024SYMXPVSSLYM1JetboatTrailerable (<= 26 ft)
Case Settlement
Off
Legislative Bill Tracking
Off
Division field is automatically filled by OIS on 06/21/2021
Off

Data Analysis of Organics and Other Sources (Volatile Chemical Products) in the California South Coast Air Basin

Principal Investigator/Author: John Seinfeld

Contractor: California Institute of Technology

Contract number: 22RD015

Relevant CARB programs: California State Implementation Plans

Topic areas: Air Pollution Exposure, State Implementation Plans (SIPs), Particulate Matter (PM), PM2.5, Emissions Data

 

Research Summary:

Caltech researchers are investigating air quality in the South Coast Air Basin, focusing on understanding the impact of a special type of chemicals called volatile chemical products. They are using field measurements, lab experiments, and computer models to analyze data collected during a 2021 research campaign. By identifying and studying these chemicals, they aim to grasp their effects on air pollution and contribute to cleaner air in California.

 

Keywords: PM2.5, secondary organic aerosols, volatile chemical products, air quality, emission sources, state implementation plans, source apportionment, air quality trend

Case Settlement
Off
Legislative Bill Tracking
Off
Division field is automatically filled by OIS on 06/21/2021
Off

Grupo de Trabajo de Equidad de Vehículos de Cero Emisiones (ZEV por sus siglas en ingles)

El Grupo de Trabajo de Equidad de Vehículos de Cero Emisiones (ZEV) (Grupo de Trabajo) reúne a líderes en el transporte de cero emisiones, como defensores de la justicia ambiental, fabricantes de automóviles, el gobierno estatal y otras organizaciones clave para desarrollar estrategias para expandir el acceso de las comunidades a ZEV y movilidad de cero emisiones.

Antecedentes

El Grupo de Trabajo de Equidad ZEV se está formando en respuesta a la dirección de los miembros de la Junta de Recursos del Aire de California (CARB por sus siglas en ingles) a través del lenguaje en la Resolución 22-12 de las Regulaciones de Advanced Clean Cars II para "ampliar el acceso de las comunidades desfavorecidas y de bajos ingresos". a los ZEV y la movilidad de cero emisiones”.

En mayo de 2023, se formó el Grupo de trabajo para cumplir con este objetivo. El objetivo principal del grupo de trabajo es acelerar el despliegue de ZEV e infraestructura de carga en comunidades desfavorecidas y de bajos ingresos en todo el estado. Planeamos lograr esto mediante la formación de asociaciones que conduzcan a proyectos tangibles en el terreno y, en última instancia, aumenten el acceso a los ZEV y la movilidad de cero emisiones.

Grupos de trabajo

Con base en la encuesta realizada antes de la reunión del Grupo de Trabajo del 30 de mayo y las discusiones durante la reunión, se identificaron cuatro categorías para agrupar los proyectos. Cada categoría tendrá su propio grupo de trabajo donde los miembros se reunirán para discutir ideas de proyectos y determinar las mejores estrategias para lograr un impacto significativo. Los grupos de trabajo son:

  • Proyectos e Incentivos de Movilidad Limpia
  • Infraestructura
  • Divulgación y Educación
  • Desarrollo de la Fuerza Laboral

Reuniones

Reuniones del Grupo de Trabajo de Equidad de ZEV

Las reuniones del Grupo de Trabajo de Equidad de ZEV se reunirán varias veces al año y reunirán a representantes de varios sectores involucrados en vehículos de cero emisiones y movilidad. Los objetivos principales de estas reuniones son recibir actualizaciones de los grupos de trabajo, idear estrategias para superar las barreras encontradas y compartir información colectivamente sobre iniciativas y proyectos estatales.

Reuniones de Grupos de Trabajo

Los grupos de trabajo se reunirán mensualmente, desarrollando proyectos relacionados con el tema del grupo de trabajo. Los grupos de trabajo informarán al Grupo de Trabajo más grande con breves actualizaciones en cada reunión del Grupo de Trabajo de Equidad.

Fecha y hora

Reuniones de Grupos de Trabajo grande y grupos de trabajo pequeños

Información adicional

30 de mayo de 2023

1 - 4 p. m.

Reunión de lanzamiento del Grupo de Trabajo de Equidad de ZEV

Agenda

Resumen de Grupos de Trabajo y Proyectos

Lista de asistentes

25 de julio de 2023

11 am - 12 pm

Grupo de trabajo de divulgación y educación

A través del enlace de Zoom en la invitación del calendario

3 de agosto de 2023

10 - 11 a.m. 

Proyectos e Incentivos de Movilidad Limpia

A través del enlace de Zoom en la invitación del calendario

Recursos adicionales

Únase al Grupo de Trabajo o a un grupo de trabajo

Si está interesado en tomar medidas para lograr resultados tangibles, lo animamos a que se unan al Grupo de Trabajo y/oa uno de los sub-grupos de trabajo. Puede proponer un nuevo proyecto o contribuir a propuestas existentes que se alineen con nuestro objetivo general. Para obtener más información sobre los grupo de trabajo o convertirse en miembro, contáctenos en ZEVEquity@arb.ca.gov.

Case Settlement
Off
Legislative Bill Tracking
Off
Division field is automatically filled by OIS on 06/21/2021
Off